Every model. Every index. Open.

The public shelf of the CIDX suite — browse what others built, open anything in one click, and publish your own.

21 Indexes 30 Models

From CIDX Press

All stories ↗

Featured

Goal published

Restore at least 95% of the ticket-bound Free State footprint within 24 hours while keeping ordinary consumer served traffic at least 95% of baseline over 72 hours, with an immediate security-failure

For a Free State-only 72-hour emergency-connectivity decision window, restore at least 95% of the ticket-bound affected footprint within 24 hours while keeping ordinary consumer served traffic at or above 95% of baseline, and stop immediately on any security failure.

ai.operations Aug 12, 2026
Model published

Bounded MCX Pilot Readiness Dynamics — refreshed capture

Illustrative two-state dynamics derived only from the CIDX prototype series: the latest modeled readiness score seeds the protected state, its complement seeds shared pressure, the latest positive stage delta drives recovery, and the largest observed one-stage decline drives regression. These are modeling parameters, not operator thresholds or observed rates.

mcxclosed-rehearsalmodeled-readiness
ai.operations Aug 12, 2026
Model published

Maxis–CelcomDigi Closed-Loop Relationship Dynamics v2

Modeled 180-day, operator-isolated acquisition, activation, retention, recovery and win-back dynamics for a 1,000,000-relationship decision population; not operator observations.

maxiscelcomdigiautomationclosed-loop
ai.operations Aug 10, 2026
Goal published

Reach 5.7 million modeled connections stable on modern access by model week 104

By 31 December 2027, migrate at least 95% of Vodacom South Africa’s active 2G/3G-only consumer and M2M connections to LTE/VoLTE or NB-IoT while maintaining at least 99.5% emergency-call completion and critical-IoT telemetry delivery and limiting each province’s rural coverage-equivalence loss to no more than 2 percentage points.

ai.operations Aug 5, 2026
Model published

Vodacom legacy-device and IoT migration dynamics

Modeled 104-week target-estate flow for legacy consumer and M2M connections. Population and rates are scenario assumptions, not operator telemetry or a forecast.

south-africavodacommodeledacceptance-test
ai.operations Aug 5, 2026
Goal published

Lift active 5G penetration 5 points by end-2027 under the DNB funding and recovery constraints

Raise active 5G-user penetration across Maxis and Axiata-linked CelcomDigi by 5 percentage points and restore 95% of modeled jointly affected traffic within 60 minutes by 31 December 2027, while keeping combined incremental DNB funding below RM600 million.

ai.operations Aug 1, 2026

Newest

Goal published

Restore at least 95% of the ticket-bound Free State footprint within 24 hours while keeping ordinary consumer served traffic at least 95% of baseline over 72 hours, with an immediate security-failure

For a Free State-only 72-hour emergency-connectivity decision window, restore at least 95% of the ticket-bound affected footprint within 24 hours while keeping ordinary consumer served traffic at or above 95% of baseline, and stop immediately on any security failure.

ai.operations Aug 12, 2026
Model published

Bounded MCX Pilot Readiness Dynamics — refreshed capture

Illustrative two-state dynamics derived only from the CIDX prototype series: the latest modeled readiness score seeds the protected state, its complement seeds shared pressure, the latest positive stage delta drives recovery, and the largest observed one-stage decline drives regression. These are modeling parameters, not operator thresholds or observed rates.

mcxclosed-rehearsalmodeled-readiness
ai.operations Aug 12, 2026
Model published

Maxis–CelcomDigi Closed-Loop Relationship Dynamics v2

Modeled 180-day, operator-isolated acquisition, activation, retention, recovery and win-back dynamics for a 1,000,000-relationship decision population; not operator observations.

maxiscelcomdigiautomationclosed-loop
ai.operations Aug 10, 2026
Goal published

Reach 5.7 million modeled connections stable on modern access by model week 104

By 31 December 2027, migrate at least 95% of Vodacom South Africa’s active 2G/3G-only consumer and M2M connections to LTE/VoLTE or NB-IoT while maintaining at least 99.5% emergency-call completion and critical-IoT telemetry delivery and limiting each province’s rural coverage-equivalence loss to no more than 2 percentage points.

ai.operations Aug 5, 2026
Model published

Vodacom legacy-device and IoT migration dynamics

Modeled 104-week target-estate flow for legacy consumer and M2M connections. Population and rates are scenario assumptions, not operator telemetry or a forecast.

south-africavodacommodeledacceptance-test
ai.operations Aug 5, 2026
Goal published

Lift active 5G penetration 5 points by end-2027 under the DNB funding and recovery constraints

Raise active 5G-user penetration across Maxis and Axiata-linked CelcomDigi by 5 percentage points and restore 95% of modeled jointly affected traffic within 60 minutes by 31 December 2027, while keeping combined incremental DNB funding below RM600 million.

ai.operations Aug 1, 2026
Model published

Malaysia shared-5G customer value transition

Scenario model for how a combined illustrative addressable customer population moves from low 5G engagement to active 5G and high-value converged relationships, with churn and win-back. It is a model proxy for the owner objective, not an observed subscriber-flow model.

malaysia5gadoptioncustomer-value +1
ai.operations Aug 1, 2026
Index published

Malaysia 5G commercial momentum and shared DNB capital exposure

Public-source Q1 2026 operator momentum compared with equal disclosed DNB acquisition and shareholder-advance exposure. High-value customer growth uses each operator's closest reported public proxy and is not perfectly harmonized.

malaysia5gmaxiscelcomdigi +2
ai.operations Aug 1, 2026
Index published

Vodacom Business IoT authored-scenario continuity readiness

An authored-scenario planning index for four Vodacom Business IoT use cases. It combines explicit scenario assumptions with common modeled anchors from LinkSim (99.25% payloads within a 1 s deadline at one Band-8 NB-IoT operating point), Comdyn (94.942% baseline and 95.323% with one modeled restoration-capacity marker), and Product (49.083% modeled adoption share at week 104 for the target-reaching portfolio candidate). Scenario-level values are authored normalizations, not observations, causal effects, operator commitments, or live performance.

vodacombusiness-iotauthored-scenariofree-state-demo +1
ai.operations Jul 28, 2026